9.6797 Stormwater – Operation and Maintenance.
This section is included in your selections.
(1) All stormwater facilities shall be operated and maintained in accordance with EC Chapters 6 and 7, and the Stormwater Management Manual.
(2) Unless the applicant proposes private maintenance of the facility, a stormwater facility that will provide treatment for runoff from the public right-of-way shall be:
(a) Designed and constructed through the Privately Engineered Public Improvement (PEPI) process; and
(b) Located in public rights of way or public easements dedicated in accordance with EC 9.6796; and
(c) Selected from the list of stormwater facilities identified in the Stormwater Management Manual as a type of facility that the City will operate and maintain.