9.7055 Applications and Review Authorities.
Table 9.7055 Applications and Review Authorities, lists applications and the typical review authorities for the decision and the appeal of the decision. To accommodate a request for concurrent review, the city may instead review multiple applications according to the highest applicable type:
R = Recommendation, D = Decision Maker, A = Appeal Review Authority |
||||||
---|---|---|---|---|---|---|
Application |
Type |
Planning Director |
Hearings Official |
Historic Review Board |
Planning Commission |
City Council |
Adjustment Review |
||||||
– Minor |
II |
D |
A |
|||
– Major |
II |
D |
A |
|||
Annexations (See EC 9.7800 |
D |
|||||
Cluster Subdivision |
II |
D |
A |
|||
Code Amendment |
V |
R |
D |
|||
Conditional Use Permit |
III |
D |
A |
|||
Conditional Use Permit, Modification |
II |
D |
A |
|||
Design Review |
II |
D |
A |
|||
Design Review, Modification |
II |
D |
A |
|||
Envision Eugene Comprehensive Plan Amendment |
IV or V |
R |
D |
|||
Expedited Land Division |
N/A (See 9.7900) |
D |
A |
|||
Extra-Territorial Extension of Water or Sewer Service |
D |
|||||
Hazardous Materials Review |
II |
D |
A |
|||
Historic Landmark (Local): |
||||||
– Designation |
III |
D |
A |
|||
– Removal of Designation |
I |
D |
||||
Historic Property: |
||||||
– Alteration |
II |
D |
A |
|||
– Demolition |
II |
D |
A |
|||
– Moving |
II |
D |
A |
|||
Metro Plan Amendment |
N/A (See EC 9.7700) |
R |
D |
|||
Middle Housing Land Division |
||||||
– Tentative Plan |
N/A (See 9.7900) |
D |
A |
|||
– Final Plat |
I |
D |
||||
Partition: |
||||||
– Tentative Plan |
II |
D |
A |
|||
– Final Plat |
I |
D |
||||
Planned Unit Development: |
||||||
– PUD Tentative Plan |
III |
D |
A |
|||
– PUD Final Plan |
II |
D |
A |
|||
– PUD Modification |
II |
D |
A |
|||
Property Line Adjustment |
I |
D |
||||
Refinement Plan Amendment |
IV or V |
R |
D |
|||
Site Review |
II |
D |
A |
|||
Site Review, Modification |
II |
D |
A |
|||
Standards Review |
II |
D |
A |
|||
Street Name Change |
IV |
R |
D |
|||
Subdivision: |
||||||
– Tentative Plan |
II |
D |
A |
|||
– Final Plat |
I |
D |
||||
Temporary Manufactured Dwelling Hardship Permit |
I |
D |
||||
Temporary Manufactured Dwelling Hardship Permit, Renewal |
I |
D |
||||
Traffic Impact Analysis Review |
II |
D |
A |
|||
Vacations: |
||||||
– Unimproved Easement |
I |
D |
||||
– Undeveloped Plat |
D |
|||||
– Unimproved Public Right-of-way, Improved Public Easements |
II |
D |
A |
|||
– Vacation and Re-dedication of Unimproved Public Right-of-way |
II |
D |
A |
|||
– Vacation of Improved Public Right-of-way, and vacation of any public way acquired with public funds |
D |
|||||
Variance |
II |
D |
A |
|||
/WQ Water Quality Overlay Zone – Map or Zone Error (See EC 9.4786 |
II |
D |
A |
|||
/WR Water Resources Conservation Overlay Zone – Map or Zone Error (See EC 9.4960) |
I or II |
D |
A |
|||
Willamette River Greenway Permit |
III |
D |
A |
|||
Willamette River Greenway Permit, Modification |
II |
D |
A |
|||
Zone Change |
III |
D |
A |
|||
Zone Change, concurrent with a refinement plan, land use code, Envision Eugene Comprehensive Plan or Metro Plan amendment shall follow applicable procedure for each type of amendment. |